Warrington Bus Depot

Project Details

Client Warrington Council
Value £8.1m
Programme 46 weeks
Form of Contract JCT standard building contract with quantities with CDP 2016 with employer’s amendments
Client KPI score 98%
Considerate Constructors Score 44/45 – beyond compliance (national average = 35)
Apprenticeship Hours 4300 hours
Waste to Landfill 0%

About The Project

Carefoot was appointed as principal contractor after a competitive tendering exercise to build the new bus depot facility for Warrington Borough Council. The scheme involved the construction of a 10-day workshop and VOSA MOT lane including additional VOSA regulation compliant lanes for the testing of road tankers.
The main building includes office accommodation, and a standalone new bus washing and refuelling facility.
The project will see the delivery of the first bus depot in the UK that has been purpose built to house an all-electric bus fleet. Carefoot installed thousands of metres of ducting and cabling required to provide charging stations for 120 electric buses, one of the largest fleets of electric buses in Europe.

Construction techniques

  • Ground remediation
  • Piled foundations
  • Structural steel frame with composite clad walls
  • Three storey integral offices with glazed curtain walling
  • Site wide ducting for EV charging system
  • 278 works to form two new entrances

Specification

  • Multi-purpose office accommodation with staff canteen and driver accommodation
  • Air, lubrication and AdBlue distribution systems to workshop
  • Double decker height doors
  • Bus lifts and inspection pits
  • Separately housed bus wash